The design and construction process in
America has greatly evolved over
the past 30 years. Competition and the demand for building construction have
forced the need for smarter and faster methods and Managers. The process,
until about 1970, involved Architects and the General Contractors they and/or
their clients chose, to provide lump sum bids based on the their plans and
specifications.
That process became mired in conflicts between building code changes, cost
over-runs and late starts due to the very nature of the process. Plans needed
to be completed long before the Owner would have a firm price. More often
than not, it meant "back to the drawing table" to scale back the
plans and scope of work. Something needed to be done to bring the builder
into the process sooner.
The budget needed to evolve concurrently with the design process. With the
advent of new materials and systems, and the design of more complicated
buildings, there was an increased demand for input regarding current costs,
methods and scheduling of the construction.
A NEW APPROACH KNOWN AS DESIGN+BUILD...has since evolved as a new
and improved process. The American Institute of Architects (AIA) recognized
and supported Design+Build as a way of bringing a higher standard to the
construction industry. Currently there are several AIA contracts that are
designed for the Owner, Architect and Construction team. Northpoint
Construction Services, Inc. recommends the DESIGN+BUILD approach and the use
of AIA documents for all projects, large and small as well.
HOW THE DESIGN+BUILD APPROACH WORKS FOR YOU - This method of
construction delivery allows the selection of all the Sub-contractors under
the supervision and coordination of our team in direct relationship and
control with the Owner. We provide total management and clear information to
the owner, making the most cost-efficient decisions as a team with the Owner.
In addition, Issues such as insurance and operations are reviewed very early
on with the client. The selection and pre-qualifying of Subcontractors to bid
the work is the next step. The sub contractor company will be selected for
its ability to perform the best job, and/or by being the lowest bidder.
THE PRE-CONSTRUCTION PHASE - The Pre-construction Phase is as
important to a successful project as a strong footing is to a tall building.
As your Construction Manager, Northpoint provides many important services to
you and your architect that will improve the quality, value and schedule of
the project before the work begins. We use a fast track schedule to
facilitate a faster start even before the design is completed. Many
activities need to be performed concurrently such as Value Engineering,
Permitting and Final Design. We will develop and maintain a comprehensive CPM
schedule that will maximize all resources. We will develop and continually
monitor the construction cost budget during the procurement process. We have
working knowledge of
LEEDS rating system and
documentations.
We have the "Know How" that comes from many years of field
experience to apply input early on in your project - when it means the most.
We think about and don't loose track of the little details that insure a cost
effective and smooth project completion for the Buyer, Suppliers, Sub
Contractors and the builder.
As your construction company, we automatically focus on three things:
- How we are going to
build it
- How long will it take
- How much will it cost
PRE CONSTRUCTION PLANNING AND VALUE ENGINEERING SAVES TIME AND MONEY
- It is important to consider the enormous costs involved when you find out a
month after the plans are complete that you are way over budget and the plans
will need to be changed - or completely redrawn. Architectural fees will
increase, and the time lost can be staggering. We do the value engineering as
the plans are being developed. If the design is getting too pricey, we are
there to help identify those issues while the plans are still in progress
with you and the Architect.
THE PRELIMINARY BUDGET AND THE PROCUREMENT PROCESS - Continual
re-evaluation goes on during both phases until all contracts are written and
executed. It begins when the Owners accept the preliminary plans and is
completed after all contract documents are written and drawn and contractors
have had time to provide final prices. In the first stage of procurement
pre-qualified contractors are asked to provide rough estimates based on the
preliminary plans. We then combine these estimates with other resources to
develop a preliminary budget. This lets the Owner know if the preliminary
design is pushing the budget too high, or if there is room to expand their
ideas further. This is one of the distinct advantages of the DESIGN+BUILD
approach.
BENEFITS TO YOU: We save time by working with you through the
Design and Permitting phases. We will fast track your project from start to
finish. We will review, with you, all the bids and comparison pricing to
insure the "best value for dollars spent". We can work
together to keep costs down.
THE CONTRACT FOR CONSTRUCTION SERVICES - The AIA contract form (AIA
131CM/c) goes into great detail about all of the responsibilities of the
Architect, the Owner and the Construction Manager. The Sub Contractors will
be held to the terms that apply to them in this agreement and in the AIA
Document A201, which is made part and parcel to all subcontract agreements.
CONSTRUCTION PHASE OF YOUR PROJECT - The Construction Management
and General Contractor work the same way during construction. We send the
final plans out for final bids, write the contracts with the Subs, prepare
the schedule, etc. There are a couple of very distinct differences, though.
The main one is the Owners involvement in the process. With Construction
Management, the Owner has final say in who is hired to perform each and every
trade. Like most General Contractors, your Construction Manager has no "in-house"
trades. Everything is "outsourced" to Sub Contractors and Vendors. |